Wednesday, 5 December 2012

Planning for filming.

Our filming schedule is as follows:
  • On Wednesday the 12th of December the group will be filming our Drum Narrative shots.
  • On Thursday the 13th of December we will be filming the Performance shots with the whole group.
  • On Friday the 14th of December we will be filming the Guitar Narrative.
  • On Sunday the 16th of December we will be filming the Bass Narrative.
We have chosen to split up all of the narrative shots and the performance as we felt that to complete all of the shots for our narrative within one day might be somewhat difficult and also would mean that a lot of our actors may be waiting around and doing nothing whilst we film a particular part. A lot of the scheduling difficulties we have faced are due mainly to other commitments meaning that group members may be away for certain days however we have decided that we will be using days where our band/group members will find it easier to get together and on days where one member might be unavailable the others will just continue to work in their absence.

We have also decided on our locations, costumes and props for the filming:

Location
  • The school Drama Departments green room (props room) for the Drum Narrative.
  • Valentines Mansion house (in Valentines Park Ilford) for the Bass Narrative.
  • A Giant Chessboard (made by the group) within a rom with white walls.
  • Drama Room 3 for the Final Performance shots.
  • The schools lift
Costume
  • Black and white clothes for the guitarists chessboard sequence (black and white clothes for all other members)
  • Casual wear for the drummer and lead singer for the drummer sequence
  • Smart modern (suit jackets) for the lead singer, drummer and Bassist in the bass sequence.
  • For the Final performance they will each wear the clothes from the part they were intorduced in.
Props
  • Mop
  • Cupboard props
  • Guitar x2
  • Amp x2
  • Drum kit
  • Bass
  • Mic

No comments:

Post a Comment